Results (
English) 1:
[Copy]Copied!
Weekly construction report NO93 attached.Inconvenience to trouble you, but please check.1 the falling wall of the building next to the canteen (polycarbonate) watching the rain While you decide. <<< beauty on it, try to use in its current state. And available canteen central door, entering and leaving.Review the test value from waste water from washing, 2 has a production plant and to consider On 3, 2-D buildings combined with area environmental remedial work (Parts yard) room and room, washing room divided into two. <<< 10/6 construction completed Arranged environment of the clean room cleaning room Installing <<< clean room and washing room between the differential pressure gauge. Differential pressure gauge get paid by MPC. Parts service entrance to the Chamber from the bottom opening and closing change hinged left and right. Boost fan installed in the fresh air, clean room internal pressure Let rise 2.5 PA. 4, after the Chamber around the construction Chamber and air conditioning MPC-1 canteen the relocation plans. I hope you consider <<< removal can be time.Design a 5, 2 d 2 F (clean room) a separate broadcast facilities. Ensure only clean-room station. 7/17 (Sunday) installation has been completed. Our schedule of instructions by MPC <<< Submit a quote additional speakers and microphones for broadcastSwinging 6, each restroom entrance, locker room entrance, to the durability of the hinge So slightly it seems there is a problem, try the cylinder type (hinge). During the week members are so come into the locker room of the canteen building Install and try the test. I replaced the <<< hinge so please check.
Being translated, please wait..
