Komiya president Eguchi adviser all
of weekly work report attached NO102.
1. wastewater of laundry, the factory consider reviewing the remediation work of the test value production environment from above,
2. Adjust the assembly area cleaning chamber of 2D building clean room, cleaning rooms and clean room environment equivalent
<<< mounting of fine differential pressure gauge. Differential pressure gauge may receive payment from MPC, such as the relocation plan
3, MPC 1 air conditioning around the cleaning chamber completion after the cleaning chamber of construction work in the dining room.
4. repair the roof of the MPC 1.
<<< November 11, purchase order accepting
the third floor part overcoat complete
filling of the warehouse, sealing second underground areas start
5. MPC 2 300 Ton construction of the press
paint from the start date for <<< December 6, epoxy-
6. MPC 1 fire protection work
<<< rise concrete completion of the first floor unit on December 6. Laying the start of the main pipe from the back side of the building, piping support Hardware Installation.
7.2 floor of 2D building, emergency light three places, the lamp body is replaced with a new one because it does not have lights. D of the building, charging is also very light in the building of the dining room, we will at any time to check the lighting.
Location, non-point there will be replaced with a new one.