Results (
English) 1:
[Copy]Copied!
9 second regular meetingRe: 10/4/2016 (Wednesday) 11:00-11:00 55Venue: Conference room, MAHLEAttendees: President Sakamoto MAHLE, bridge-like MR FERDIE, MR ROMEL Dharma Honda, Albert, Ford, Mira1 the building front side pavement construction completing the repair of <<< some rain water accumulates2, receiving substation construction (750 KVA) is continuing wiring and plumbing works. At the end of <<< 10, pettanko the electric sector (CEI) inspection plan.3, Office, telephone, LAN, each 1 place the production area spin-4 with car Create a quote to set up. Submit a quote to 6/18. Construction work and scramble for construction. Time, to consider.Will receive a production machine layout by Ferdi next week during the 4 Thank you for the <<< layout and creating a design drawing.These pavement 5 extension chemical warehouse, building existing building factory Create a blueprint and estimate. <<< To the 9/27 drawing, estimate submission6 in an existing plant to new Office. Create a blueprint and estimate. <<< to the 9/27 drawing, estimate submission7, confirm the paperwork involved regarding the building delivery today, and tomorrow, in the field Implement a description of the checking and handling.Create a quote 8, pavement construction and repair work of existing chemical warehouse Plant that is 11/15-in to complete 11/10 for visitors I hope your instructions is more than a chance, such as supplemental information.The next regular meeting 10/18 (Tuesday) 11:00-will be scheduled.
Being translated, please wait..
