MPC-1
Urabe plant
daily we are indebted from.
MPC-1 3-floor building, the roof of the warehouse building part, the repair quote of gutter
we attached. And sorry to trouble you, but, please Sashu please.
3 floor building is three items, the warehouse building are the two items, a total of five items of quote
you Yes attach.
1, 3-floor building minute (March 2004 completion)
estimated number
# 1, (blue diagonal lines in the figure) repair waterproofing of the roof the entire
accumulated amount P1,500,000 pesos
# 2, the joint portion of the roof material (4 lines) waterproofing and damage roofing
waterproofing work of only a portion (purple on the drawing)
accumulated amount P370,000 pesos
# 3, repair waterproofing of concrete gutter and the factory side rising wall (green on the drawing)
accumulated amount P500,000 pesos
* # 1 and # 2, but will be selected, it is a temporary repair and # 2 of the joint and damage
but Shinoge in repair waterproof construction of the only place, so we have passed the roofing material is about 12 years
the entire repair waterproof please let me recommend the construction work.
2, warehouse building (December 1997 completion)
estimated number
# 4, repair waterproofing work of connecting the roof of the roof over the entire surface and the factory building and warehouse building (drawing on the green hatching)
accumulated amount P750,000 pesos
# 5, concrete gutter and parapet repair waterproofing of the wall (on the drawing red and pale blue)
accumulated amount P200,000 pesos
but is more than, any questions, please what ... your instructions If you have had your check or your seat.
In addition, when it was marked with the convenience of your time, I would like to go up to your description.
Thank you.