Komiya president Eguchi adviser everyone
we become very care on a regular basis.
The weekly work report NO96 we attached.
And sorry to trouble you, but, please confirm.
1, the waste water from the laundry, the factory will consider reviewing the test value from to the production
environment corrective work on 2,2D building assembly area
cleaning chamber is adjust to the clean room and the environment equivalent to
the cleaning chamber and clean room <<< mounted between differential pressure gauge. Differential pressure gauge is get paid than MPC like
relocation plan 3, and air conditioning in the wash chamber after the completion of the cleaning chamber around construction work in MPC-1 Canteen.
<<< Please consider the time that can be removable.
4,2D Building 2F (in a clean room) designed to be independent broadcast facility a.
Only to scheduled broadcast clean room is to be able to.
July 17 (Sunday) installation is complete.
<<< MPC get a schedule of instruction than like
submission and broadcast microphone additional speaker of quote
5, each toilet entrance, locker room entrance of the swing doors, the durability of the hinge
because it seems a little problem there, we are attempting cylinder type (hinge).
Since it came members during this week, in the locker room of the Canteen building
and then try to test mounting.
Since the exchange did <<< hinge asks you for confirmation.
6, to prepare a waterproof construction sample along with the MPC-1 roof repair work.
To deliver up to November 4 (Friday).
<<< To deliver the October 27, the construction sample.
7, MPC-2 300 ton press construction
<<< pouring plan of the base concrete at the end of next week.
8, MPC-1 private fire fighting equipment work
<<< pump house to start the construction work for the temporary enclosure removal plan of the trees of the area from next week
will do for your exorcism Upon removal of trees
for the roof inspection to 9, MPC-2 Canteen Building and mounting the ladder.
(MPC-1, MPC-2 whole building, we become to use the inspection of the roof can be.)
Or more and will you, but your request, please take my name is anything if you have had you pointed out etc .. seat.