The weekly work report NO93 we attached.
And sorry to trouble you, but, please confirm.
1, Canteen building next to the edge wall (polycarbonate) is, the state of the rainy weather
to determine while watching.
<<< Try to use remains also there status quo that aesthetic.
And out using the Canteen center door.
2, waste water from the laundry, the factory will consider reviewing the test value from to the production
environment corrective work on 3,2D building assembly area
separating the cleaning chamber, front chamber and (parts storage) the room in two.
<<< Completion of construction on October 6,
the cleaning chamber is adjust to the clean room and the environment equivalent to
attach the <<< clean room of the cleaning chamber between differential pressure gauge. Differential pressure gauge is get paid than MPC-like.
To change the parts carry-in entrance to the wash chamber from the upper and lower opening and closing to the left and right retractable.
The clean room internal pressure mounting to boost fan fresh air
was allowed to rise 2.5PA.
4, relocation plans and air conditioning in the cleaning chamber to the MPC-1 Canteen after the completion of the cleaning chamber around construction work.
<<< Please consider the time that can be removable.
5,2D Building 2F (in a clean room) designed to be independent broadcast facility a.
Only to scheduled broadcast clean room is to be able to.
July 17 (Sunday) installation is complete.
<<< Get a schedule of instruction than the MPC like
submit a quote of broadcasting for the microphone and additional speakers
6, each toilet entrance, locker room entrance of the swing doors, the durability of the hinge
because it seems a little problem there, we are attempting cylinder type (hinge).
Since it came members during this week, in the locker room of the Canteen building
and then try to test mounting.
Since the exchange did <<< hinge asks you for confirmation.